Drilling

We have a specialist tractor mounted investigation rig for the drilling, construction and testing of monitoring or production bores and for geotechnical services.  

We can work under 4.5m and mobilise over sandy or boggy locations that other rigs cant reach!

Rig Specifications

Hollow augers (75 mm ID) 
  • Wireline coring, for undisturbed sediment samples
  • Screened sampling auger for discrete interval sampling.

RC (twin tube)  

  • rapid geological evaluation,
  • ground water yield estimation
  • water quality measurements 
  • aquifer analysis prior to production bore drilling and sieve analysis.
Mud rotary drilling
  •  production bores

Composite logs and location diagrams click to see examples

We can log the samples if required and provide whole bore completion reports or simply bore composite logs with bore location plans,

Sieve analysis click to see examples

Make your bore an efficient sand filter

Sieve analysis enables custom bore design to minimise sand pumping, which is essential with drip or nozzle irrigators.

  Microsoft Word

Australian Bore Consultants Pty. Ltd.